Facts on the Ammerland solar park, Wiefelstede/Oldenburg, Germany:
- World’s largest solar park with CIGS thin-film modules
- Area 57 hectares
- Output 20.8 megawatts
- Power requirement of 6,000 four-person homes
- 11,800-tonne CO2 savings per year
- 20 mill. produced kilowatt hours per year
- 196,000 solar modules
- 30,718 installed posts
- 30,718 installed angle brackets
- 98,000 installed module carrier systems
- 160,800 installed bolts (24 t)
- 59 kilometres of installed longitudinal carrier profiles
All in an assembly time of just 8.5 weeks


